Yes you can. You can set a lower and upper limit on the duration correction factor and BoincRescheduler will adjust the factor, when it goes out of this range.
http://www.efmer.eu/forum_tt/index.php?topic=428.0 (http://www.efmer.eu/forum_tt/index.php?topic=428.0) Read the config.xml part.